Video library

Temporary site cables
Temporary construction cables are used during the maintance, repair and modification of overhead lines and substations. The cables act as a temporary bridge within or between cable or OHL circuits as well as providing emergency power supply as a contingency or within an emergency return to service requirement.

Press coverage: Inauguration of Nexans High Voltage plant in Charleston, USA
The inauguration of our High Voltage plant located in Goose Creek (near Charleston), South Carolina (USA) took place on October 8, 2014.

Nexans breaks ground on its first high voltage (HV) cable manufacturing plant in North America
Nexans has started the construction of its first high voltage power cable manufacturing plant in North America.

How fast will you get out?
This simple movie shows the difference when there is a fire in a room (place) with standard cables compared to a place that has our low fire hazard cables.

C/S Nexans Skagerrak ready to put to sea after major conversion and upgrade project
22/03/10Dedicated cable laying ship has been lengthened by 12.5 metres to increase its cable handling capabilities.

Nexans wins 100 million Euros power cable contract for the London Array offshore wind farm project
14/12/09High voltage subsea power export cables for the world’s largest wind farm.

Frank Schmidt, head of Business Unit Superconductor Activity, tells us more about superconductivity
Frank Schmidt, head of Business Unit Superconductor Activity, tells us more about superconductivity