Tyra Kraka – oil & gas
Trenching of 12"-16” pipelines down to two meters.
Project description
- Protection of a 12” to 16” steel pipeline.
- Out-of-straightness correction of steel pipeline.
Project challenges
- The pipeline had to be trenched down to two meters in very dense sand.
- The purpose was to provide maximum backfill and meet straightness requirements.
![]() |
Nexans' solution:
|